Merrimack Power Station

NAFCO was contracted to detail, fabricate, and install the structural steel and provide the silo tunnel concrete on this limestone handling project.  The project consisted of nine different conveyors, five of which are tubular galleries which varied in size from 9’-6” to 10’-6” in diameter.  The total length of tubular galleries was more than 1,600…

Kryger Creek Power Station

Material handling systems supporting Flue-gas desulfurization (FDG) installation consisting of Limestone Receiving Conveyor, LS Transfer Conveyors, LS Delivery Conveyors, Gypsum Waste Reclaim Conveyor and Gypsum Stackout Conveyor with enclosed galleries, bents, receiving hoppers, transfer towers and transition Chutework. Stats Location: Cheshire, OH In Service: 2007 Total Tons: 850 Gallery

Oxbow – Enid

In August 2014, Wolf Point Engineers & Contractors contracted with Oxbow Calcining LLC for complete engineering, procurement, installation and commissioning (EPC) for a new screening, crushing, storage and rail loading system to be incorporated into their existing calcining facility located near Enid, Oklahoma. The new system utilizes a series of five bucket elevators and five…

TPS Sand Plant

NAFCO designed, fabricated, and supplied 6,201 feet of conveyors for a Frac Sand Processing plant in Humbird, Wisconsin.  The project included two 48” conveyors with transfer towers, screening building, and associated chutework.  The project included 1,600 tons of steel with a two coat sophisticated paint system applied for corrosion protection.  (See Pictures from WPE W…

Protective Stadium

NAFCO continued to showcase our expertise in sports and stadium work with the detailing, fabrication and erection of the strutural and miscellaneous scopes for Protective Stadium. This marquee project in downtown Birmingham is home to UAB football, the USFL, and many other teams and events. NAFCO staged deliveries for just-in-time delivery from our shop to…