CPS Energy

NAFCO contracted for the design, supply, electrical design, detailing, fabrication and installation of the entire material handling system for CPS Energy at the Calaveras Lake Generating Station near San Antonio, Texas.  They system which allows CPS to receive shipments of coal and transport it to the power plant.  The project included the construction of a…

Cliff’s Oak Grove

NAFCO contracted to demolish and replace the preparation plant and conveyors at Cliffs Natural Resources’ Oak Grove facility, which were severely damaged by the tornadoes that swept through Alabama in April 2011. The scope of this project included the engineering, manufacturing, and installation of a 54-inch-belt-width plant feed conveyor, a 48-inch-belt-width refuse conveyor, a 48-inch-belt-width…

Cliff’s Bloom Lake

NAFCO fabricated and delivered 5,500 tons of structural steel for a iron ore conveyor and loadout storage structure in Quebec, Canada.  All material was provided as cold weather steel due to the inclement weather conditions for the area.  A two coat sophisticated paint system was applied in the shop for additional corrosion protection.  NAFCO utilized…

Bryant Denny Stadium Renovations

NAFCO provided detailing, fabrication and erection for the Bryant Denny Stadium expansion and renovations in 2020. This unique and intricate project included stadium expansions and retrofitting the existing stadium to feature more luxury boxes. NAFCO’s team worked through COVID-19 and multiple on-site challenges to expedite the erection schedule and deliver a high-quality project in time…

Birmingham News Building

NAFCO fabricated and delivered the entrance façade and the interior bridges that connected the two individual office areas for this landmark building.  Originally built for the Birmingham News in downtown Birmingham.  An Architecturally exposed stainless steel awning accents the entrance. Stats Location: Birmingham, AL Total Tons: 400 Gallery

Koch Metallurgical Coal

NAFCO detailed, fabricated and delivered twelve, 10′ diameter, 40′ long tubular gallery sections and the associated supports to Long Beach, CA for Koch Minerals. NAFCO was specifically selected for this work based on our extensive experience in tubular gallery fabrication. The work included two-coat paint application, mechanical assembly, and shipping across the country to support…

Smithfield Foods

This train unloading conveyor system for Smithfield Foods at their Rose Hill, NC facility for the purpose of unloading and trucking feed. The project consisted of 500 tons of steel for the train unloading structure, (7) 36” conveyor trusses, (5) 30” conveyor trusses, bents & Transfer towers. The project also included a 30” underground reclaim…

Marshall Space Flight Center

NAFCO joined the mssions to Mars through the work completed for NASA’s test stands at the Marshall Space Flight Center in Huntsville, AL. This three year project included the detailing, connection design, fabrication and erection of over 4,500 tons of steel. The test stands will be used for static testing of the liquid oxygen and…

Merrimack Power Station

NAFCO was contracted to detail, fabricate, and install the structural steel and provide the silo tunnel concrete on this limestone handling project.  The project consisted of nine different conveyors, five of which are tubular galleries which varied in size from 9’-6” to 10’-6” in diameter.  The total length of tubular galleries was more than 1,600…

Kryger Creek Power Station

Material handling systems supporting Flue-gas desulfurization (FDG) installation consisting of Limestone Receiving Conveyor, LS Transfer Conveyors, LS Delivery Conveyors, Gypsum Waste Reclaim Conveyor and Gypsum Stackout Conveyor with enclosed galleries, bents, receiving hoppers, transfer towers and transition Chutework. Stats Location: Cheshire, OH In Service: 2007 Total Tons: 850 Gallery